Rogz For Dogs Fanbelt Long Lead Black 20 Mmx1,8 Mtr
SKU: 17864.68703
Sold and shipped by FurFun Shop
- Weight0.115 kg
If you are looking for a contemporary trendy collar, harness or lead, you have come to the right place. Out you go and strut your stuff with the Utility collection from Rogz for Dogz!
Rogz for Dogz has various nylon collections of very high quality. The Utility collection comes in various cheerful colours with reflective stripes.
The Fanbelt range is 20 mm wide, intended for medium to large dogs such as the Spaniel, Staffordshire Bull Terrier or Boxer.
The Fanbelt lead has a length of 1,8 metres.
Who would still dare say that your four-legged friend can't look incredibly tough out on the street?
Treat your dog to a Rogz for Dogz collar and matching lead.
Tip:
Also take a look at the Fancy Dress range from Rogz for Dogz!
Cat lovers can also indulge in the various trendy cat collars from Rogz Catz.
Size: 1,8 m, size L
Suitable for dogs with a weight of 21-40 kg
| SKU | 17864.68703 |
|---|---|
| Weight | 0.115 kg |
| Country | Delivery | Free delivery from |
|---|---|---|
| United Kingdom | £2.99 | £30 |
- Free UK delivery on orders of £30 or more.
- Sent from UK warehouses by Royal Mail Tracked or courier. Delivery usually takes 5–9 working days, a little longer from October to December.
- Items from different warehouses may arrive in separate parcels, at no extra cost to you.
- All prices include UK VAT. You receive a tracking link by email when your order ships.
Changed your mind?
- You have 14 days from receiving your order to withdraw, no reason needed. Use the withdrawal form or email us with your order number.
- Send the items back within 14 days of telling us. We send you the return address; the cost of returning is yours.
- We refund the items and the original standard delivery cost within 14 days, to the payment method you used.
Damaged or faulty?
- Email contact@fxneurope.eu with your order number and a photo.
- Every product is covered by the 2-year EU legal guarantee: repair or replacement, or a price reduction or refund if that is not possible, at no cost to you.






Reviews
There are no reviews yet.